The City plans to reconstruct Highland Avenue, from Lexington Street to the City line just before Longfellow Road. The existing roadway pavement and gravel subbase materials will be ground up and reused to create a new "base" for the road and the road will then be repaved. 

The work will also include new concrete sidewalks and driveway aprons located within the City's right-of-way lines. The goal of the project is to rake a "complete streets approach" to the road to provide a better sidewalks along Highland Avenue and will also include granite curbing, grass planting strips, new shade trees, and tree pits for stormwater treatment and at select locations. 

Traffic calming techniques, such as raised intersections, will also be considered to reduce vehicular speeds on the street and improve pedestrian safety.

August 2022:  

The project is being awarded to Newport Construction.  Additional information regarding schedule will be posted shortly. 

April 2022:

The City is proceeding with design for construction later this year.

January 2022:

The City's engineering consultant, TetraTech, has completed land surveying and is working with City staff to develop concept plans. 