Annual Road Program

Each year, the Department of Public Works reviews street conditions to develop its annual road reconstruction program. The program is based on a number of factors such as street and sidewalk conditions as well as past and planned utility work. The proposed program is presented to the Town Council Committee on Public Works, which then reviews and makes recommendations to the entire Town Council.


2021 Annual Road Program

The following streets have been selected for full reconstruction as part of the Town’s 2021 Annual Road Program. Roadway reconstruction entails removing and replacing the existing roadway, regrading of the road, and rehabilitation of the roadway base.  Per Town Council directive, roads that undergo full reconstruction also receive granite curb installation, new concrete sidewalks and driveway aprons, and ADA-compliant accessible ramps.  


Residential Driveway Information

Guide to the Planting Strip

Winter Maintenance and Deicing

Presentation to Public Works Subcommittee September 24, 2021



2020 Annual Road Program

Full Depth Reconstruction (curbs, grass strip and sidewalks included):

Presentation to Public Works Subcommittee August 22, 2019

2020 Annual Road Program FAQs

Residential Driveway Information

2019 Annual Road Program

Full Depth Reconstruction (curbs, grass strip and sidewalks included):

Presentation to Public Works Subcommittee December 18, 2018

2019 Annual Road Program FAQs


2018 Annual Road Program

Full Depth Reconstruction (curbs, grass strip and sidewalks included):

  • Edgecliff Road
  • Westland Road and Woodleigh Road
  • Everett Avenue (Bartlett to Palfrey)
  • Malden Street
  • Priest Road
  • Arden Road

2019 Road Presentation Priest Road

Presentation To Public Works Subcommittee October 18, 2018


2017 Annual Road Program

Full Depth Reconstruction (curbs, grass strip and sidewalks included):

  • Hovey Street
  • Cushman Street
  • Waltham Street(Rosedale Road to Bridge Street)
  • Knowles Road, including Holly Street and Whitcomb Avenue
  • Irma Avenue


Presentation To Public Works Subcommittee October 27, 2016


2016 Annual Road Program

Full Depth Reconstruction (curbs, grass strip and sidewalks included):

  • Edenfield Avenue( Main to Waverly)
  • Hillside Road (Belmont Street to Hillcrest Circle)
  • Hillcrest Circle
  • Grenville Road
  • Merrill Road
  • Purvis Street


Presentation To Public Works Subcommittee February 4, 2016